{"vid":"136081","uid":"425","title":"INTOG Strategic Environmental Assessment Screening and Scoping Report","log":"Created by AdamC.","status":"1","comment":"0","promote":"0","sticky":"0","ds_switch":"","nid":"23240","type":"data_source","language":"und","created":"1670425680","changed":"1670429002","tnid":"0","translate":"0","revision_timestamp":"1670429002","revision_uid":"2","body":{"und":[{"value":"<p>The Sectoral Marine Plan for Innovation and Targeted Oil and Gas (INTOG) decarbonisation Strategic Environmental Assessment Screening and Scoping Report September 2022 which sets out the proposed scope and detail of the strategic environmental assessment including methodology and information to used.</p>\r\n","summary":"","format":"filtered_html","safe_value":"<p>The Sectoral Marine Plan for Innovation and Targeted Oil and Gas (INTOG) decarbonisation Strategic Environmental Assessment Screening and Scoping Report September 2022 which sets out the proposed scope and detail of the strategic environmental assessment including methodology and information to used.</p>\n","safe_summary":""}]},"field_type":{"und":[{"tid":"614"}]},"field_datasource_link":[],"field_citation":[],"field_reference":[],"field_map_type_tag":[],"field_datasource_keywords":[],"field_tags":[],"field_manual_data_tag":[],"field_data_owner":[],"field_document":{"und":[{"fid":"206306","uid":"425","filename":"intog_sea_screening_and_scoping_september_2022.pdf","uri":"public://intog_sea_screening_and_scoping_september_2022.pdf","filemime":"application/pdf","filesize":"1885184","status":"1","timestamp":"1670425624","type":"document","_drafty_revision_requested":"FIELD_LOAD_CURRENT","rdf_mapping":[],"path":{"pathauto":"0"},"title":"","alt":"","metadata":[],"display":"1","description":""}]},"field_mslot_stage":[],"field_mslot_application_type":[],"field_mslot_other_document_categ":[],"field_date_submitted":{"und":[{"value":"2022-12-07 00:00:00","timezone":"Europe/London","timezone_db":"Europe/London","date_type":"datetime"}]},"field_mslot_ag_categories":[],"field_cfwg_category":[],"field_transfer_and_delegation_do":[],"rdf_mapping":{"rdftype":["sioc:Item","foaf:Document"],"title":{"predicates":["dc:title"],"type":"property"},"created":{"predicates":["dc:date","dc:created"],"datatype":"xsd:dateTime","callback":"date_iso8601"},"changed":{"predicates":["dc:modified"],"datatype":"xsd:dateTime","callback":"date_iso8601"},"body":{"predicates":["content:encoded"],"type":"property"},"uid":{"predicates":["sioc:has_creator"],"type":"rel"},"name":{"predicates":["foaf:name"]},"comment_count":{"predicates":["sioc:num_replies"],"datatype":"xsd:integer"},"last_activity":{"predicates":["sioc:last_activity_date"],"datatype":"xsd:dateTime","callback":"date_iso8601"}},"path":"https://marine.gov.scot/?q=node/23240","name":"AdamC","picture":"0","data":"a:6:{s:16:\"ckeditor_default\";s:1:\"t\";s:20:\"ckeditor_show_toggle\";s:1:\"t\";s:14:\"ckeditor_width\";s:4:\"100%\";s:13:\"ckeditor_lang\";s:2:\"en\";s:18:\"ckeditor_auto_lang\";s:1:\"t\";s:7:\"overlay\";i:1;}","workbench_moderation":{"current":{"hid":"133782","vid":"136081","nid":"23240","from_state":"draft","state":"published","uid":"2","stamp":"1670429002","published":"1","is_current":1,"title":"INTOG Strategic Environmental Assessment Screening and Scoping Report","timestamp":"1670429002"},"published":{"hid":"133782","vid":"136081","nid":"23240","from_state":"draft","state":"published","uid":"2","stamp":"1670429002","published":"1","is_current":1,"title":"INTOG Strategic Environmental Assessment Screening and Scoping Report","timestamp":"1670429002"},"my_revision":{"hid":"133782","vid":"136081","nid":"23240","from_state":"draft","state":"published","uid":"2","stamp":"1670429002","published":"1","is_current":1,"title":"INTOG Strategic Environmental Assessment Screening and Scoping Report","timestamp":"1670429002"}}}