<?xml version="1.0" encoding="utf-8"?>
<result><vid>117200</vid><uid>30648</uid><title>Neart na Gaoithe Offshore Windfarm (Revised Design) - Section 36 Consent Variation - Appropriate Assessment Validation</title><log>Edited by RebeccaB.</log><status>1</status><comment>0</comment><promote>0</promote><sticky>0</sticky><ds_switch></ds_switch><nid>17798</nid><type>data_source</type><language>und</language><created>1559566071</created><changed>1559655252</changed><tnid>0</tnid><translate>0</translate><revision_timestamp>1559655252</revision_timestamp><revision_uid>0</revision_uid><body><und is_array="true"><item><value>&lt;p&gt;Appropriate Assessment validation&amp;nbsp;in respect of the request to vary the section 36 consent of the Neart na Gaoithe Offshore Windfarm&lt;/p&gt;&#13;
&#13;
&lt;p&gt;The variation application sought to amend Annex 1 and Annex 2 of the s.36 consent granted on&amp;nbsp;3 December 2018&amp;nbsp;to allow the following variations :&lt;/p&gt;&#13;
&#13;
&lt;ul&gt;&#13;
	&lt;li&gt;The removal of references to the Offshore Substation Platforms (“OSPs”), interconnector cables, and Offshore Export Cables (“OEC”) from the Description of the Development in Annex 1 and from conditions 12 and 22 of Annex 2;&lt;/li&gt;&#13;
	&lt;li&gt;Amendment of minimum blade tip clearance in Annex 1 from 35 metres to 36 metres (measured from Lowest Astronomical Tide (“LAT”)); and&lt;/li&gt;&#13;
	&lt;li&gt;Amendment of blade width in Annex 1 from 4.5 metres to 5.5 metres&lt;/li&gt;&#13;
&lt;/ul&gt;&#13;
</value><summary></summary><format>filtered_html</format><safe_value>&lt;p&gt;Appropriate Assessment validation in respect of the request to vary the section 36 consent of the Neart na Gaoithe Offshore Windfarm&lt;/p&gt;
&lt;p&gt;The variation application sought to amend Annex 1 and Annex 2 of the s.36 consent granted on 3 December 2018 to allow the following variations :&lt;/p&gt;
&lt;ul&gt;
&lt;li&gt;The removal of references to the Offshore Substation Platforms (“OSPs”), interconnector cables, and Offshore Export Cables (“OEC”) from the Description of the Development in Annex 1 and from conditions 12 and 22 of Annex 2;&lt;/li&gt;
&lt;li&gt;Amendment of minimum blade tip clearance in Annex 1 from 35 metres to 36 metres (measured from Lowest Astronomical Tide (“LAT”)); and&lt;/li&gt;
&lt;li&gt;Amendment of blade width in Annex 1 from 4.5 metres to 5.5 metres&lt;/li&gt;
&lt;/ul&gt;
</safe_value><safe_summary></safe_summary></item></und></body><field_type><und is_array="true"><item><tid>1871</tid></item></und></field_type><field_datasource_link/><field_citation/><field_reference/><field_map_type_tag/><field_datasource_keywords/><field_tags/><field_manual_data_tag/><field_data_owner/><field_document><und is_array="true"><item><fid>92091</fid><uid>30648</uid><filename>Appropriate Assessment Validation</filename><uri>public://nng_-_s.36_variation_-_aa_validation_redacted.pdf</uri><filemime>application/pdf</filemime><filesize>75533</filesize><status>1</status><timestamp>1559566037</timestamp><type>document</type><_drafty_revision_requested>FIELD_LOAD_CURRENT</_drafty_revision_requested><rdf_mapping/><path><pathauto>1</pathauto></path><title></title><alt></alt><metadata/><display>1</display><description></description></item></und></field_document><field_mslot_stage><und is_array="true"><item><tid>1868</tid></item></und></field_mslot_stage><field_mslot_application_type><und is_array="true"><item><tid>1843</tid></item></und></field_mslot_application_type><field_mslot_other_document_categ><und is_array="true"><item><tid>1911</tid></item></und></field_mslot_other_document_categ><field_date_submitted><und is_array="true"><item><value>2019-04-09 00:00:00</value><timezone>Europe/London</timezone><timezone_db>Europe/London</timezone_db><date_type>datetime</date_type></item></und></field_date_submitted><field_mslot_ag_categories/><field_cfwg_category/><field_transfer_and_delegation_do/><rdf_mapping><rdftype is_array="true"><item>sioc:Item</item><item>foaf:Document</item></rdftype><title><predicates is_array="true"><item>dc:title</item></predicates><type>property</type></title><created><predicates is_array="true"><item>dc:date</item><item>dc:created</item></predicates><datatype>xsd:dateTime</datatype><callback>date_iso8601</callback></created><changed><predicates is_array="true"><item>dc:modified</item></predicates><datatype>xsd:dateTime</datatype><callback>date_iso8601</callback></changed><body><predicates is_array="true"><item>content:encoded</item></predicates><type>property</type></body><uid><predicates is_array="true"><item>sioc:has_creator</item></predicates><type>rel</type></uid><name><predicates is_array="true"><item>foaf:name</item></predicates></name><comment_count><predicates is_array="true"><item>sioc:num_replies</item></predicates><datatype>xsd:integer</datatype></comment_count><last_activity><predicates is_array="true"><item>sioc:last_activity_date</item></predicates><datatype>xsd:dateTime</datatype><callback>date_iso8601</callback></last_activity></rdf_mapping><path>https://marine.gov.scot/?q=data/neart-na-gaoithe-offshore-windfarm-revised-design-section-36-consent-variation-appropriate</path><name>RebeccaB</name><picture>0</picture><data>a:5:{s:16:"ckeditor_default";s:1:"t";s:20:"ckeditor_show_toggle";s:1:"t";s:14:"ckeditor_width";s:4:"100%";s:13:"ckeditor_lang";s:2:"en";s:18:"ckeditor_auto_lang";s:1:"t";}</data><workbench_moderation><current><hid>108468</hid><vid>117200</vid><nid>17798</nid><from_state>needs_review</from_state><state>published</state><uid>23681</uid><stamp>1559655252</stamp><published>1</published><is_current>1</is_current><title>Neart na Gaoithe Offshore Windfarm (Revised Design) - Section 36 Consent Variation - Appropriate Assessment Validation</title><timestamp>1559655252</timestamp></current><published><hid>108468</hid><vid>117200</vid><nid>17798</nid><from_state>needs_review</from_state><state>published</state><uid>23681</uid><stamp>1559655252</stamp><published>1</published><is_current>1</is_current><title>Neart na Gaoithe Offshore Windfarm (Revised Design) - Section 36 Consent Variation - Appropriate Assessment Validation</title><timestamp>1559655252</timestamp></published><my_revision><hid>108468</hid><vid>117200</vid><nid>17798</nid><from_state>needs_review</from_state><state>published</state><uid>23681</uid><stamp>1559655252</stamp><published>1</published><is_current>1</is_current><title>Neart na Gaoithe Offshore Windfarm (Revised Design) - Section 36 Consent Variation - Appropriate Assessment Validation</title><timestamp>1559655252</timestamp></my_revision></workbench_moderation></result>
